The main concern of modern production is to avoid waste. The MPS Manual Production Systems from Rexroth have been developed strictly in line with aspects for lean production, enabling simple and fast planning and implementation of lean production installations.
The demands on modern, lean production are more than just focusing on individual modules. In fact, an integrated system with a uniform implementation concept comes to the forefront. At Rexroth, this concept is reflected by the MPS philosophy.
ACTIVE Shuttle helps increasing the automation of your intralogistics processes and material supply. The ACTIVE Shuttle Management System (AMS) enables highly flexible order management, in which orders can be entered manually or automatically fed via third systems.